Skip to main content
↑

TETRA Interoperability Certificates

TETRA Interoperability Certificates & Test Reports

TETRA Interoperability testing and certification is carried out by the Certification Body DEKRA on behalf of TCCA.

Contact details of the Certification Body:

Felipe San Martin

tcca-cb@dekra.com

Phone: +56 971 47 87 35 (Whatsapp preferred)

Background on IOP Certification

The results presented in the TETRA Interoperability Certificates are derived from evaluating the information exchange between live TETRA terminals and live TETRA infrastructures, this constitutes IOP certification testing. The IOP certification testing is done in a multi vendor environment testing the interaction between different brands of equipment.

Interoperability Certification process

Interoperability certification process
The certification process is managed by TCCA’s Technical Forum (TF) with targets and priorities set jointly between users, operators and manufacturers. For each feature to be certified a TETRA Interoperability Profile (TIP) specification is created in the Working Groups established under the TF. The draft TIP specification subjected to open Members’  Enquiry (ME) to give all TCCA members an equal opportunity to comment it before the TIP is approved by the TF. Subsequently to the TIP a detailed Interoperability Test Plan document is produced in an identical procedure. TCCA has contracted DEKRA to act as an outside certification authority, to supervise the testing sessions and to issue the certificates.

After the official certification documents are approved, test sessions can be conducted between the manufacturers. The sessions are supervised by the experts of Dekra, who then analyse the results and issue a detailed official Interoperability Certificate. The certification process is funded by the participating manufacturers.

How protocol testing is done: background on IOP certification
The results presented in the TETRA Interoperability Certificates are derived from evaluating the information exchange between live TETRA terminals and live TETRA infrastructures, this constitutes IOP certification testing. The IOP certification testing is done in a multi vendor environment testing the interaction between different brands of equipment.

The certification testing is based on IOP test plans. The IOP test plans are focused on testing the requirements of one or more corresponding TETRA Interoperability Profile (TIP).

Each TETRA Interoperability Profile (TIP) is based on ETSI TETRA standards. They primarily constitute a clarification of the ETSI TETRA standards and may impose limitation to the implementation of TETRA functionality compared to the ETSI standards. This is to achieve a market consisting of interoperable TETRA equipment.

With the currently available IOP test plans all certification testing focuses on functionality on the OSI model layers two, three and higher thus being frequency band independent. The test results derived are solely dependent on the implementation of the protocol stack, therefore if the same protocol stack is used in several pieces of equipment it may be assumed that all pieces of equipment will exhibit the same protocol behaviour and that results of testing protocol dependent functionality should be the same. The physical layer is used as means for conveying information between the terminals and the infrastructure, no physical layer functionality is evaluated.

Testing of frequency band related functionality is part of the type approval testing.

Please find below links to the relevant IOP forms and information pages:

Public Resources:

There are a number of resources available for TCCA members, these can be found in the member area here. 

 

Certificates & Test Reports

The table below provides a comprehensive list of performed test sessions. By clicking on the test session ID, it is possible to view and download the certifiates and test reports.

Status ID Participants Interfaces Type Date Host Venue
Future 1010 Rohill (SwMI) To be confirmed (MS) TMO Multi 18/01/2027 - 09/04/2027 Rohill  Hoogeveen (NL)
Future 1011 Airbus DS (SwMI) Hytera (MS) TMO Single 23/11/2026 - 04/12/2026 Airbus DS Helsinki (FI)
Future 1009 Teltronic (SwMI) Hytera (MS) Teltronic (MS) TMO Multi 26/10/2026 - 20/11/2026 Teltronic Zaragoza (ES)
Awaiting Publication 1007 Eastcom (SwMI) Eastcom (MS) TMO Multi 08/08/2026 - 23/10/2026 Eastcom Hangzhou (CN)
Completed 1006 Motorola Solutions (SwMI) Sepura (MS) TMO Multi 13/04/2026 - 24/06/2026 Motorola Solutions Krakow (PL)
Completed 1008 Rohill (SwMI) Hytera (MS) TMO Single Full 14/01/2026 - 11/02/2026 Rohill Hoogeveen (NL)
Completed 1005 Airbus (SwMI) Motorola Solutions (MS) TMO
DMO
GW
Single Full 20/10/2025 - 07/11/2025 Airbus Helsinki (FL)
Completed 1004 Teltronic (SwMI) Hytera (MS) TMO Single Full 26/06/2025 - 03/07/2025 Teltronic Zaragoza (ES)
Completed 1003 Teltronic (SwMI) Teltronic (MS) TMO Single Full 09/06/2025 - 25/06/2025 Teltronic Zaragoza (ES)
Completed 1002 Airbus (SwMI) Motorola Solutions (MS) Motorola Solutions (GW) TMO
DMO
GW
Single Full 02/06/2025 - 13/06/2025 BDBOS Berlin (DE)
Completed 1001 Motorola Solutions (SwMI) Motorola Solutions (MS) TMO Single Full 06/05/2025 - 16/05/2025 Motorola Solutions Krakow (PL)
Completed 200 BDBOS Airbus (SwMI) Sepura (MS) TMO
DMO
Single Partial 03/12/2024 - 04/12/2024 BDBOS Berlin (DE)
Completed 199 Motorola Solutions (SwMI) TMO Single Full 19/06/2024 - 28/06/2024 Motorola Solutions Krakow (PL)
Completed 198 Airbus (SwMI) Hytera (MS) TMO Single Full 13/05/2024 - 23/05/2024 Airbus Defence & Space O Airbus Defence & Space Oy Helsinki (FL)
Completed 197 Motorola (SwMI) Motorola (MS) DMO Single 25/04/2024 - 10/05/2024 Motorola Solutions Penang (MY)
Completed 195 Damm (SwMI) Hytera (MS) Motorola Solutions (MS) Sepura (MS) TMO Multi 09/01/2024 - 06/03/2024 DAMM Cellular Systems Sønderborg (DK)
Completed 196 Teltronic (SwMI) Hytera (MS) TMO Single Full 16/10/2023 - 25/10/2023 Teltronic Zaragoza (ES)
Completed 192 Motorola Solutions (SwMI) Airbus Defence & Space (MS) Hytera (MS) Motorola Solutions (MS) Sepura (MS) TMO Multi 08/05/2023 - 17/11/2023 Motorola Kraków (PL)
Completed 194 HMF Smart Solutions GmbH (SwMI) Hytera Communication Co., Ltd (MS) TMO Single Full 19/04/2023 - 28/04/2023 HMF Smart Solutions Bad Münder (DE)
Completed 193 Airbus (SwMI) Sepura (MS) TMO Single Full 13/03/2023 - 05/04/2023 BDBOS Airbus Berlin (DE)
Completed 191 Airbus (SwMI) Sepura (MS) TMO
DMO
GW
Single Full 10/10/2022 - 13/10/2022 BDBOS Airbus Berlin (DE)
Completed 180 Airbus (SwMI) Sepura (MS) TMO
GW
Single Full 05/09/2022 - 15/09/2022 Airbus Helsinki (FI)
Completed 181 Sepura (MS) DMO Single Full 14/07/2022 - 04/08/2022 Sepura Cambridge (GB)
Completed 187b Airbus (SwMI) Motorola Solutions (MS) TMO Single Full 20/06/2022 - 14/07/2022 Airbus Helsinki (FI)
Completed 187a Airbus (SwMI) Motorola Solutions (MS) TMO
DMO
GW
Single Full 30/05/2022 - 17/06/2022 BDBOS Airbus Berlin (DE)