Skip to main content
↑

TETRA Interoperability Certificates

TETRA Interoperability Certificates & Test Reports

TETRA Interoperability testing and certification is carried out by the Certification Body DEKRA on behalf of TCCA.

Contact details of the Certification Body:

Felipe San Martin

tcca-cb@dekra.com

Phone: +56 971 47 87 35 (Whatsapp preferred)

Background on IOP Certification

The results presented in the TETRA Interoperability Certificates are derived from evaluating the information exchange between live TETRA terminals and live TETRA infrastructures, this constitutes IOP certification testing. The IOP certification testing is done in a multi vendor environment testing the interaction between different brands of equipment.

Interoperability Certification process

Interoperability certification process
The certification process is managed by TCCA’s Technical Forum (TF) with targets and priorities set jointly between users, operators and manufacturers. For each feature to be certified a TETRA Interoperability Profile (TIP) specification is created in the Working Groups established under the TF. The draft TIP specification subjected to open Members’  Enquiry (ME) to give all TCCA members an equal opportunity to comment it before the TIP is approved by the TF. Subsequently to the TIP a detailed Interoperability Test Plan document is produced in an identical procedure. TCCA has contracted DEKRA to act as an outside certification authority, to supervise the testing sessions and to issue the certificates.

After the official certification documents are approved, test sessions can be conducted between the manufacturers. The sessions are supervised by the experts of Dekra, who then analyse the results and issue a detailed official Interoperability Certificate. The certification process is funded by the participating manufacturers.

How protocol testing is done: background on IOP certification
The results presented in the TETRA Interoperability Certificates are derived from evaluating the information exchange between live TETRA terminals and live TETRA infrastructures, this constitutes IOP certification testing. The IOP certification testing is done in a multi vendor environment testing the interaction between different brands of equipment.

The certification testing is based on IOP test plans. The IOP test plans are focused on testing the requirements of one or more corresponding TETRA Interoperability Profile (TIP).

Each TETRA Interoperability Profile (TIP) is based on ETSI TETRA standards. They primarily constitute a clarification of the ETSI TETRA standards and may impose limitation to the implementation of TETRA functionality compared to the ETSI standards. This is to achieve a market consisting of interoperable TETRA equipment.

With the currently available IOP test plans all certification testing focuses on functionality on the OSI model layers two, three and higher thus being frequency band independent. The test results derived are solely dependent on the implementation of the protocol stack, therefore if the same protocol stack is used in several pieces of equipment it may be assumed that all pieces of equipment will exhibit the same protocol behaviour and that results of testing protocol dependent functionality should be the same. The physical layer is used as means for conveying information between the terminals and the infrastructure, no physical layer functionality is evaluated.

Testing of frequency band related functionality is part of the type approval testing.

Please find below links to the relevant IOP forms and information pages:

Public Resources:

There are a number of resources available for TCCA members, these can be found in the member area here. 

 

Certificates & Test Reports

The table below provides a comprehensive list of performed test sessions. By clicking on the test session ID, it is possible to view and download the certifiates and test reports.

Status ID Participants Interfaces Type Date Host Venue
Completed 159 Airbus (MS) Hytera (MS) Motorola (SwMI) Motorola (MS) Sepura (MS) TMO Multi 04/09/2017 - 26/01/2018 Motorola Krakow (PL)
Completed 161 Hytera (SwMI) Sepura (MS) TMO Single Full 04/09/2017 - 26/09/2017 Hytera Mobilfunk Flensburg (DE)
Completed 160 Airbus BDBOS (SwMI) Motorola (MS) TMO Single Full 03/07/2017 - 11/07/2017 Airbus BDBOS Berlin (DE)
Completed 158 Motorola (MS) Rohill (SwMI) TMO Single Full 27/06/2017 - 06/07/2017 Rohill Hoogeveen (NL)
Completed 157 Airbus D&S (SwMI) Hytera (MS) TMO Single Full 26/04/2017 - 28/04/2017 Airbus Helsinki (FI)
Completed 156 Eastcom (SwMI) Piciorgros (MS) TMO Single Partial 14/03/2017 - 15/03/2017 Eastcom Cologne (DE)
Completed 155 Sepura (REP) Sepura (MS) DMO Single Full 06/02/2017 - 17/02/2017 Sepura Cambridge (GB)
Completed 154 Airbus BDBOS (SwMI) Sepura (GW) Sepura (MS) DMO
GW
Single Full 23/01/2017 - 27/01/2017 Airbus BDBOS Berlin (DE)
Completed 153 Hytera (MS) Teltronic (SwMI) TMO Single Full 14/11/2016 - 25/11/2016 Teltronic Zaragoza (ES)
Completed 151 Airbus Defence & Space (SwMI) Motorola Solutions (SwMI) ISI Multi 24/10/2016 - 27/10/2016 Motorola Solutions Glostrup (DK)
Completed 152 Airbus Defence & Space (SwMI) Airbus Defence & Space (MS) TMO Single Full 03/10/2016 - 05/10/2016 Airbus Jyväskylä (FI)
Completed 150 Hytera Mobilfunk (SwMI) Motorola (MS) TMO Single Full 09/08/2016 - 19/08/2016 Hytera Mobilfunk Bad Münder (DE)
Completed 149 Motorola Solutions (SwMI) Motorola Solutions (MS) TMO Single Full 12/04/2016 - 21/04/2016 - Krakow (PL)
Completed 148 Damm (SwMI) Motorola Solutions (MS) TMO Single Full 29/02/2016 - 04/03/2016 Damm Sønderborg (DK)
Completed 145 Airbus D&S (SwMI) Motorola Solutions (MS) Motorola Solutions (GW) TMO
GW
Single Full 07/12/2015 - 18/12/2015 Airbus Helsinki (FI)
Completed 144 Airbus D&S-BDBOS (SwMI) Motorola Solutions (MS) Motorola Solutions (REP) TMO Single Full 25/11/2015 - 03/12/2015 Motorola Solutions Berlin (DE)
Completed 147 Sepura (GW) Teltronic (SwMI) DMO
GW
Single Full 12/11/2015 - 13/11/2015 Teltronic Zaragoza (ES)
Completed 146 Sepura (MS) Teltronic (SwMI) TMO Single Full 03/11/2015 - 11/11/2015 Teltronic Zaragoza (ES)
Completed 143 Hytera (MS) Hytera (GW) Hytera (REP) Hytera Mobilfunk (SwMI) DMO
GW
Single Full 28/09/2015 - 02/10/2015 Hytera Mobilfunk Bad Münder (DE)
Completed 142 Piciorgros (MS) TMO Single Full 09/07/2015 - 10/07/2015 Hytera Mobilfunk Bad Münder (DE)
Completed 140 Airbus (SwMI) Airbus (MS) Hytera (MS) Motorola (MS) Selex (MS) Sepura (MS) TMO Multi 08/06/2015 - 16/10/2015 Airbus Helsinki (FI)
Completed 141 Airbus (SwMI) Airbus (MS) TMO Single Full 21/04/2015 - 23/04/2015 Airbus Helsinki (FI)
Completed 137 Airbus (MS) Funkwerk (MS) Hytera Mobilfunk (SwMI) Hytera Mobilfunk (MS) Motorola (MS) Piciorgros (MS) Selex (MS) Teltronic (MS) TMO Multi 16/03/2015 - 16/06/2015 Hytera Mobilfunk Bad Münder (DE)
Completed 139 Motorola (SwMI) Motorola (MS) TMO Single Full 23/02/2015 - 06/03/2015 Motorola Krakow (PL)
Completed 138 Airbus (SwMI) Motorola (MS) TMO Single Full 26/01/2015 - 06/02/2015 Airbus Helsinki (FI)