Skip to main content
↑

TETRA Interoperability Certificates

TETRA Interoperability Certificates & Test Reports

TETRA Interoperability testing and certification is carried out by the Certification Body DEKRA on behalf of TCCA.

Contact details of the Certification Body:

Felipe San Martin

tcca-cb@dekra.com

Phone: +56 971 47 87 35 (Whatsapp preferred)

Background on IOP Certification

The results presented in the TETRA Interoperability Certificates are derived from evaluating the information exchange between live TETRA terminals and live TETRA infrastructures, this constitutes IOP certification testing. The IOP certification testing is done in a multi vendor environment testing the interaction between different brands of equipment.

Interoperability Certification process

Interoperability certification process
The certification process is managed by TCCA’s Technical Forum (TF) with targets and priorities set jointly between users, operators and manufacturers. For each feature to be certified a TETRA Interoperability Profile (TIP) specification is created in the Working Groups established under the TF. The draft TIP specification subjected to open Members’  Enquiry (ME) to give all TCCA members an equal opportunity to comment it before the TIP is approved by the TF. Subsequently to the TIP a detailed Interoperability Test Plan document is produced in an identical procedure. TCCA has contracted DEKRA to act as an outside certification authority, to supervise the testing sessions and to issue the certificates.

After the official certification documents are approved, test sessions can be conducted between the manufacturers. The sessions are supervised by the experts of Dekra, who then analyse the results and issue a detailed official Interoperability Certificate. The certification process is funded by the participating manufacturers.

How protocol testing is done: background on IOP certification
The results presented in the TETRA Interoperability Certificates are derived from evaluating the information exchange between live TETRA terminals and live TETRA infrastructures, this constitutes IOP certification testing. The IOP certification testing is done in a multi vendor environment testing the interaction between different brands of equipment.

The certification testing is based on IOP test plans. The IOP test plans are focused on testing the requirements of one or more corresponding TETRA Interoperability Profile (TIP).

Each TETRA Interoperability Profile (TIP) is based on ETSI TETRA standards. They primarily constitute a clarification of the ETSI TETRA standards and may impose limitation to the implementation of TETRA functionality compared to the ETSI standards. This is to achieve a market consisting of interoperable TETRA equipment.

With the currently available IOP test plans all certification testing focuses on functionality on the OSI model layers two, three and higher thus being frequency band independent. The test results derived are solely dependent on the implementation of the protocol stack, therefore if the same protocol stack is used in several pieces of equipment it may be assumed that all pieces of equipment will exhibit the same protocol behaviour and that results of testing protocol dependent functionality should be the same. The physical layer is used as means for conveying information between the terminals and the infrastructure, no physical layer functionality is evaluated.

Testing of frequency band related functionality is part of the type approval testing.

Please find below links to the relevant IOP forms and information pages:

Public Resources:

There are a number of resources available for TCCA members, these can be found in the member area here. 

 

Certificates & Test Reports

The table below provides a comprehensive list of performed test sessions. By clicking on the test session ID, it is possible to view and download the certifiates and test reports.

Status ID Participants Interfaces Type Date Host Venue
Completed 109 Cassidian (SwMI) Sepura (MS) TMO Single Full 01/10/2012 - 31/10/2012 Cassidian Helsinki (FI)
Completed 107 Cassidian (SwMI) Motorola (MS) TMO Single Full 01/10/2012 - 31/10/2012 Cassidian Berlin (DE)
Completed 106 Cassidian (SwMI) Sepura (GW) GW Single Full 01/10/2012 - 31/10/2012 Cassidian Berlin (DE)
Completed 108 Motorola (REP) Motorola (MS) Sepura (REP) Sepura (MS) DMO Single Full 01/10/2012 - 31/10/2012 Motorola Krakow (PL)
Completed 115 Motorola (GW) Motorola (MS) Teltronic (SwMI) Teltronic (MS) GW Multi 17/09/2012 - 21/12/2012 Teltronic Zaragoza (ES)
Completed 114 Cassidian (MS) Hytera (MS) Motorola (MS) Piciorgros (MS) Teltronic (SwMI) Teltronic (MS) Unimo (MS) TMO Multi 17/09/2012 - 21/12/2012 Teltronic Zaragoza (ES)
Completed 105 3T Communications (SwMI) Sepura (GW) GW Single Partial 01/06/2012 - 30/06/2012 3T Communications Vienna (AT)
Completed 104 3T Communications (SwMI) Sepura (MS) TMO Single Partial 01/06/2012 - 30/06/2012 3T Communications Vienna (AT)
Completed 103 3T Communications (SwMI) Motorola (GW) GW Single Partial 01/06/2012 - 30/06/2012 3T Communications Vienna (AT)
Completed 102 3T Communications (SwMI) Motorola (MS) TMO Single Partial 01/06/2012 - 30/06/2012 3T Communications Vienna (AT)
Completed 101 Damm (SwMI) Piciorgros (MS) TMO Single Full 01/06/2012 - 30/06/2012 Damm Sønderborg (DK)
Completed 100 3T Communications (SwMI) Piciorgros (MS) TMO Single Partial 01/05/2012 - 31/05/2012 3T Communications Vienna (AT)
Completed 099 3T Communications (SwMI) Funkwerk (MS) TMO Single Full 01/05/2012 - 31/05/2012 3T Communications Vienna (AT)
Completed 098 Cassidian (SwMI) Cassidian (SwMI) ISI Single Full 01/05/2012 - 31/05/2012 Cassidian Helsinki (FI)
Completed 097 Cassidian (SwMI) Cassidian (MS) Cleartone (MS) Hytera (MS) Motorola (MS) Piciorgros (MS) Sepura (MS) Teltronic (MS) Unimo (MS) TMO Multi 01/02/2011 - 28/02/2011 Cassidian Helsinki (FI)
Completed 095 Cassidian (SwMI) Sepura (GW) GW Multi 01/02/2011 - 28/02/2011 Cassidian Helsinki (FI)
Completed 096 Cassidian (MS) Cleartone (MS) Hytera (MS) Motorola (SwMI) Motorola (MS) Sepura (MS) Teltronic (MS) TMO Multi 01/01/2011 - 31/01/2011 Motorola Glostrup (DK)
Completed 094 Cassidian (MS) Motorola (MS) Piciorgros (MS) Selex (SwMI) Selex (MS) Sepura (MS) TMO Multi 01/11/2010 - 30/11/2010 Selex Florence (IT)
Completed 093 Eads (MS) Hytera (MS) Piciorgros (MS) Rohill (SwMI) Sepura (MS) Teltronic (MS) Unimo (MS) TMO Multi 01/05/2010 - 31/05/2010 Rohill Hoogeveen (NL)
Completed 092 Cleartone (REP) Cleartone (MS) Eads (MS) Motorola (MS) Sepura (REP) Sepura (MS) Teltronic (MS) DMO Multi 01/04/2010 - 30/04/2010 Astrid Brussels (BE)
Completed 091 Cleartone (MS) Eads (MS) Motorola (MS) Sepura (MS) Teltronic (SwMI) Teltronic (MS) TMO Multi 01/03/2010 - 31/03/2010 Teltronic Zaragoza (ES)