Skip to main content
↑

TETRA Interoperability Certificates

TETRA Interoperability Certificates & Test Reports

TETRA Interoperability testing and certification is carried out by the Certification Body DEKRA on behalf of TCCA.

Contact details of the Certification Body:

Felipe San Martin

tcca-cb@dekra.com

Phone: +56 971 47 87 35 (Whatsapp preferred)

Background on IOP Certification

The results presented in the TETRA Interoperability Certificates are derived from evaluating the information exchange between live TETRA terminals and live TETRA infrastructures, this constitutes IOP certification testing. The IOP certification testing is done in a multi vendor environment testing the interaction between different brands of equipment.

Interoperability Certification process

Interoperability certification process
The certification process is managed by TCCA’s Technical Forum (TF) with targets and priorities set jointly between users, operators and manufacturers. For each feature to be certified a TETRA Interoperability Profile (TIP) specification is created in the Working Groups established under the TF. The draft TIP specification subjected to open Members’  Enquiry (ME) to give all TCCA members an equal opportunity to comment it before the TIP is approved by the TF. Subsequently to the TIP a detailed Interoperability Test Plan document is produced in an identical procedure. TCCA has contracted DEKRA to act as an outside certification authority, to supervise the testing sessions and to issue the certificates.

After the official certification documents are approved, test sessions can be conducted between the manufacturers. The sessions are supervised by the experts of Dekra, who then analyse the results and issue a detailed official Interoperability Certificate. The certification process is funded by the participating manufacturers.

How protocol testing is done: background on IOP certification
The results presented in the TETRA Interoperability Certificates are derived from evaluating the information exchange between live TETRA terminals and live TETRA infrastructures, this constitutes IOP certification testing. The IOP certification testing is done in a multi vendor environment testing the interaction between different brands of equipment.

The certification testing is based on IOP test plans. The IOP test plans are focused on testing the requirements of one or more corresponding TETRA Interoperability Profile (TIP).

Each TETRA Interoperability Profile (TIP) is based on ETSI TETRA standards. They primarily constitute a clarification of the ETSI TETRA standards and may impose limitation to the implementation of TETRA functionality compared to the ETSI standards. This is to achieve a market consisting of interoperable TETRA equipment.

With the currently available IOP test plans all certification testing focuses on functionality on the OSI model layers two, three and higher thus being frequency band independent. The test results derived are solely dependent on the implementation of the protocol stack, therefore if the same protocol stack is used in several pieces of equipment it may be assumed that all pieces of equipment will exhibit the same protocol behaviour and that results of testing protocol dependent functionality should be the same. The physical layer is used as means for conveying information between the terminals and the infrastructure, no physical layer functionality is evaluated.

Testing of frequency band related functionality is part of the type approval testing.

Please find below links to the relevant IOP forms and information pages:

Public Resources:

There are a number of resources available for TCCA members, these can be found in the member area here. 

 

Certificates & Test Reports

The table below provides a comprehensive list of performed test sessions. By clicking on the test session ID, it is possible to view and download the certifiates and test reports.

Status ID Participants Interfaces Type Date Host Venue
Completed 183 Kaitec (SwMI) Motorola (MS) TMO Single Full 24/05/2022 - 26/05/2022 Kaitec Hösbach (DE)
Completed 184 Kaitec (SwMI) Sepura (MS) TMO Single Full 16/05/2022 - 18/05/2022 Kaitec Hösbach (DE)
Completed 190 Eastcom (SwMI) Eastcom (MS) TMO Single 22/11/2021 - 25/02/2022 Eastcom Hangzhou (CN)
Completed 182 Hytera (SwMI) Hytera (MS) TMO Single 24/06/2021 - 23/07/2021 Hytera Shenzhen (CN)
Completed 189 Airbus (MS) Piciorgros (REP) DMO Single 31/05/2021 - 04/06/2021 Funk-Electronic Piciorgros London (GB)
Completed 188 Damm (SwMI) Damm (SwMI) ISI Multi 25/05/2021 - 26/05/2021 Damm Cellular Systems Sønderborg (DK)
Completed 186 Motorola (SwMI) Motorola (MS) TMO
DMO
Single 18/03/2021 - 19/05/2021 Motorola Krakow (PL)
Completed 179 Damm (SwMI) Funktel (MS) TMO Single Full 11/11/2019 - 15/11/2019 Damm Sønderborg (DK)
Completed 178 HBFEC (SwMI) Hytera (MS) TMO Single Full 22/07/2019 - 26/07/2019 HBFEC Shijiazhuang (CN)
Completed 177 Sepura (MS) Sepura (MS) DMO Single Full 16/07/2019 - 17/07/2019 Sepura Cambridge (GB)
Completed 176 Airbus (SwMI) Airbus (MS) DMO
GW
Single Full 10/06/2019 - 28/06/2019 Airbus Jyväskylä (FI)
Completed 174 Damm (SwMI) Motorola (MS) Sepura (MS) TMO Multi 13/05/2019 - 30/08/2019 Damm Sønderborg (DK)
Completed 170 Teltronic (SwMI) ISI Single Full 24/04/2019 - 26/04/2019 Teltronic Zaragoza (ES)
Completed 175 Airbus (MS) Motorola (SwMI) TMO Single Full 15/04/2019 - 18/04/2019 Motorola Krakow (PL)
Completed 169 Eastcom (SwMI) Eastcom (MS) Funktel (MS) Motorola (MS) Sepura (MS) TMO Multi 15/04/2019 - 31/05/2019 Eastcom Köln (DE)
Completed 172 Sepura (MS) Smart Route (SwMI) TMO Single Full 12/03/2019 - 15/03/2019 Smart Route Scottsdale (US)
Completed 173 Airbus (MS) Airbus BDBOS (SwMI) Motorola (MS) TMO
DMO
Single Full 25/02/2019 - 07/03/2019 Airbus BDBOS Berlin (DE)
Completed 171 Motorola (MS) Smart Route (SwMI) TMO Single Full 05/02/2019 - 07/02/2019 Smart Route Scottsdale (US)
Completed 167 Hytera (MS) Motorola (MS) Sepura (MS) Teltronic (SwMI) Teltronic (MS) TMO Multi 14/01/2019 - 29/03/2019 Teltronic Zaragoza (ES)
Completed 168 Airbus (MS) Funktel (MS) Piciorgros (MS) Smart Route (SwMI) TMO Multi 24/09/2018 - 30/11/2018 Smart Route Scottsdale (US)
Completed 166 Airbus (SwMI) Airbus (MS) Hytera (MS) Leonardo (MS) Motorola (MS) Sepura (MS) TMO Multi 05/09/2018 - 01/02/2019 Airbus Helsinki (FI)
Completed 165 Airbus (MS) Motorola (SwMI) TMO Single Full 19/03/2018 - 22/03/2018 Motorola Krakow (PL)
Completed 164 Airbus BDBOS (SwMI) Motorola (MS) TMO
DMO
GW
Single Full 29/01/2018 - 09/02/2018 Airbus BDBOS Berlin (DE)
Completed 163 Motorola Solutions (SwMI) Motorola Solutions (MS) TMO Single Full 12/12/2017 - 19/12/2017 Motorola Copenhagen (DK)
Completed 162 Hytera (SwMI) Hytera (MS) TMO Single Full 27/09/2017 - 11/10/2017 Hytera Mobilfunk Flensburg (DE)